Tenders

To show an expression of interest in any of the following projects either:

Condev Construction uses EstimateOne for tendering purposes. Sign-up to this free service to connect with Condev on our future projects.

Name Description Closing Date Contract Start PDF Status Contact
Vicinity Robina

Project Location: 18 Campus Crescent, Robina, Gold Coast 4226

Medical Consultancy Facility

  • Two levels with one basement
  • Thirteen (13) tenancies (note the omission of tenancy number 4)
  • Fifty-seven (57) basement carparking spots, twenty-two (22) parking spots on ground level
  • On-site bio-retention
  • Post-tensioned suspended slabs
  • Structural steel wall and roof framing on upper level
  • Metal, FC and composite claddings to the external façade
  • Double glazed window system (refer to energy efficiency report)
  • Fire door to the basement (entire building is unsprinkled)
  • Various metalwork elements to the buildings façade
  • Construction duration 11 months approx.

Confirm Pricing ASAP TBC Download Preferred Contractor Brad Smith
The Village, Manly

162 Oceana Terrace, Manly QLD 4179

The construction of four (4) low rise residential towers comprising a total yield of 100 retirement units, consisting of;
• Stage 1 46 Apartments (Tower 01 – 23, Tower 02 – 23)
• Stage 2 54 apartments (Tower 03 – 25, Tower 04 – 29)

The residential towers are constructed on a common single level basement (split into the two stages) consisting of 136 car spaces, storage cages, and other back of house areas to support the village operations. At the ground level of buildings 3&4 there is a residents community centre

Tender Closed TBC Download Awaiting Tender Results Daniel Worcester
One Cannes

Project Location: 1 Cannes Ave, Surfers Paradise, Gold Coast

Project Details:

  • 18 storeys (1x podium communal space, 2x above-ground parking levels, 14x residential levels, 1x roof terrace)
  • 84 apartments
  • 2 basements
  • 135 parking spaces
  • Common facilities i.e. Gym, yoga studio, sauna, lap pool, recreational terrace, lounge, boardroom, multi-purpose space, private dining
  • Construction duration TBA

Open - Confirm Pricing ASAP August 2021 Download Successful Brad Smith
EB321 Francis Apartments (Building C) D&C

60 Bridge Street, Wooloowin QLD 4030

Design and construct a 58 unit residential apartment building comprising of 6 Above Ground Storeys + Rooftop plus 2 Basements and associated carparking including but not limited to the associated hard, soft landscaping, fencing and driveways.

Closed October 2021 Download Awaiting Tender Results Daniel Worcester
C448 St. Hilda’s Bourne, Fittock and Granowski Redevelopment

Project involves the partial demolition and redevelopment of the existing Bourne, Fittock and Granowski buildings at the St. Hilda’s School Southport on the Gold Coast.

Separable Portion 01 (SP01) – Demolition of existing Fittock Building and construction of new combined Bourne/Fittock building.

Separable Portion 02 (SP02) –  Demolition of the existing Granowski building, and construction of new Granowski building, including the refurbishment of existing technology building.

Separable Portion 03 (SP03) – Demolish existing Bourne building and complete external works.

 

 

Open Construction Commenced April 2021 Download Successful Brad Smith
EB308 “Shoreline” Queens Beach

124 Prince Edward Parade, Scarborough QLD

The new development involves the partial demolition of existing buildings and structures, and construction of a new apartment building.
8 levels plus rooftop mechanical plant and screening. 21 high end apartments comprising 17 x 3 bedroom apartments and 4 x 4 bedroom penthouse apartments across 7 levels. 1 ½ levels of basement

Open Construction Commenced Download Successful Lewis Evans
EB235 Wooloowin Stage 1-3 Terrace Homes D+C

60 Bridge Street, Wooloowin QLD 4030

The site is a long-term project which proposes to deliver a medium density integrated housing community over five stages,
The conceptual architectural design for Stage 1 is complete, inclusive of specifications, finishes, fittings, fixtures and equipment schedules. The contractor is to apply the same architectural design to Stages 2-3

Tenderers are required to provide a lump sum price for each separable portion along with a price for each different typology and corner lots:
SP1 – Cluster 4 (four terrace homes)
SP2 – Cluster 1, 2, 3, 5 and 6 (23 terrace homes)
SP3 – Stage 2 terrace homes (20 terrace homes)
SP4 – Stage 3 terrace homes (12 terrace homes)

Tender Closed Onsite start date of 25 January 2021. Download Successful Lewis Evans
C444 Capital Court

Capital Court, Varsity Lakes QLD 4227

  • Two Level Basement
  • 257 One and Two bedroom apartments across two towers (16 levels and 10 levels)
  • Roof top communal facilities above the sixteen level tower
  • Ground level communal facilities, pool and lobby

 

Open Construction Commenced Feb 2021 Download Successful Brad Smith

Tenders

EXPRESSIONS OF INTEREST TO TENDER - ONLINE FORM

Please note that submission of this form does not guarantee that the Subcontractor or Supplier will be invited to tender. Please feel free to view our privacy policy below.
  • Must include mobile numbers.

Please Note:
All Subcontractors must hold the following:

  • Current Work Cover Insurance (valid for the state in which the project is situated)
  • Current Public Liability Insurance to the value of $20,000,000 and Contract Works Insurance
  • Current relevant industry licences (These must be produced prior to letting of contracts)