Tenders

To show an expression of interest in any of the following projects either:

  • Download an expression of interest form in PDF format (37Kb) (this form may be faxed or posted – details at bottom of this page)
  • Fill in our online form; or
  • Email us at estimating@condevconstruction.com.au

 

Condev Construction uses Bid Contender for tendering purposes. Sign-up to this free service to connect with Condev on our future projects.

Name Description Closing Date Contract Start PDF Status Contact
EB145 Glasshouse Christian College Stage1B

58 Roberts Road Beerwah QLD 4519

The construction of a new, two storey, hospitality, dance and drama building and refurbishment of the central carpark

Tender closed TBA Download Awaiting Tender Results Daniel Tweedy
EB140 Moray Street, New Farm Residential Development D+C

155 Moray Street, New Farm QLD 4005

Completion design and construction of a multi level residential building incorporation twenty six apartments over six levels and a two level basement. Any reference to Penthouses – refers to the 3 apartments on Level 6
Demolition of existing buildings, including slabs on ground, trees and high level footings, will be by others.

Tender Closed 24th June 2019 Download Awaiting Tender Results Adam Read
E994 Alexandria Residences

80 Plucks Road, Arana Hills QLD 4054

The package will include the civil and retaining walls, construction works to deliver 3 Land Lots, 77 Townhouses across 33 buildings and a Recreational Facility.

Tender Closed January 2019 Download Awaiting Tender Results Lewis Evans
EB128 Springfield Clubhouses

We invite you to provide a price for the DA16 Springfield Club house containing buildings 1,2,3,4 & 5 (Please exclude building 6)

Please note external pavement is also to be excluded.

Tender closed. TBA Download Successful Contractor. Please Confirm Quotes ASAP Daniel Tweedy
E1123 Gold Coast Airport Hotel

Gold Coast Airport, Coolangatta QLD 4225

The Gold Coast Airport Hotel project, which will consist of a new 8 storey building plus a single basement car parking level hotel with 192 guest rooms.

It will also provide ancillary facilities such as a gym and rooftop function area and restaurant.

Confirm Pricing November 2018 Download Preferred Contractor Brad Smith
E997A Design Centre (Somerset College)

Somerset Drive, Mudgeeraba QLD 4213

The proposed development includes a new technology hub building within the existing Somerset College Campus. The building is over 3 levels and comprises of the following accommodation:
Ground Floor – Teaching space and storage area
Level 1 – Teaching space and storage area
Level 2 – Meeting Space and Roof Terrace

Successful. Construction commenced Download Successful Brad Smith
E1129 Palm Beach Apartments

1330 Gold Coast Highway, Palm Beach QLD 4221

The works will comprise fo a two level basement up to podium (stage 1a) and building consisting of a 102 unit 12 storey tower. The landscaping works are not included at this time

Successful Construction commenced Download Successful Contractor. Please Confirm Quotes ASAP Marcello Pellicciotti
EB062 Wellington Rd Design and Construct

163 Wellington Road, East Brisbane QLD 4169
The proposed development will comprise construction of an eight level residential building over a two level in ground basement car park consisting of
– Seventy-five (75) one and two bedroom apartments constructed in a single eight (8) storey residential apartment block; (of which 66 are sold)
– Ninety-nine (99) carparking spaces
– Retail to ground floor
– Pool and roof terrace
– Verge works to the Wellington Road and Waterloo Street frontages.

Construction anticipated to commence on 2nd July 2018.

Condev Construction tendered this project in May 2017. it remains fundamentally the same.

Successful Construction commenced Download Successful Contractor. Please Confirm Quotes ASAP Lewis Evans
C365 SUCCESSFUL CONTRACTOR Zinc Apartments, Haig St Kirra

13/15 Haig Street, Coolangatta Queensland 4225

This project involves the construction of a 9 storey apartment building with 2 basements at Haig Street, Kirra.

All documentation available at this time has been provided within the “20170623 Bidcontender Documentation” folder in the BidContender invitation – No other documentation is available at this time.

Project Details
 No demolition
 72 apartments
 Single manager’s unit on ground floor
 Recreation area with pool, spa, barbeque and sauna
 106 off-street parking spaces
 Roof-top mechanical plant
 Two lifts and rubbish chute
 Concrete lid roof

Successful Construction commenced Download Successful Contractor. Please Confirm Quotes ASAP Brad Smith
EB097 Holden and Nissan Redevelopment, Aspley

1454 Gympie Road, Aspley QLD 4034
Demolishing part of the existing Holden showroom and part of the used car sales building;
 Extension to the existing Holden showroom and office and new Nissan showroom and offices and ground level and first floor level;
 Changes to the existing general service repair workshop to
– create mezzanine floor space (toilets and lunchroom); and
– reconfigure workshop area to create additional service bays; and
 Extension to the approved multi-deck car storage area by one (1) additional deck level.

Successful early June Download Successful Contractor. Please Confirm Quotes ASAP Paul Conroy

Tenders

EXPRESSIONS OF INTEREST TO TENDER - ONLINE FORM

Please note that submission of this form does not guarantee that the Subcontractor or Supplier will be invited to tender. Please feel free to view our privacy policy below.
  • Must include mobile numbers.

Please Note:
All Subcontractors must hold the following:

  • Current Work Cover Insurance (valid for the state in which the project is situated)
  • Current Public Liability Insurance to the value of $20,000,000 and Contract Works Insurance
  • Current relevant industry licences (These must be produced prior to letting of contracts)